
3
18 Hydro Quebec Catch Reservoir, Quebec
19 Latimer Heights Phase 1, British Columbia
Important notes
All current safety regulations and guidelines
applicable in those countries where our products
are used must be observed.
The photos shown in this brochure feature
construction sites in progress. For this reason,
safety and anchor details in particular cannot
always be considered conclusive or final. These
are subject to the risk assessment carried out by
the contrac-tor.
In addition, the computer graphics used are to be
regarded as system representations. To facilitate
understanding, these and the detailed illustrations
shown have been partially reduced to certain
aspects. The safety installations that are not
shown in these detailed descriptions must
nevertheless be available. The systems or items
shown might not be available in every country.
Safety instructions and load specifications are to
be strictly observed at all times. Separate
structural calculations are required for any
deviations from the standard design data.
The information contained herein is subject to
technical changes in the interests of progress.
Errors and typographical mistakes reserved.
Canadian site references